Six Elements

The framework for effective and equitable engagement outlined in RP 1185 provides a set of six primary elements or processes to be consistently applied throughout the pipeline life cycle.

 

 

The six elements and their corresponding sections within the RP are discussed in greater detail in the Plan, Do, and Check/Adjust sections of the site. Demonstrating the importance of these elements, each corresponding section contains at least one “shall” or “conditional shall” statement detailing process or program requirements. A “conditional shall” statement will include a qualifier to allow operators flexibility in how they meet the requirement. Examples of conditional shall statements include:

  • An operator shall strive …
  • An operator shall consider …

Each section also contains a separate requirement to maintain minimum program documents.